A different side of North Carolina awaits on these 5 scenic bike trails

Wooden footbridge over water surrounded by colorful autumn foliage at Lake Raleigh in North Carolina

Most cyclists who live in a densely populated city face an interesting paradox. You want to ride your bike to get from point A to point B, but you must navigate cars, scooters, stoplights and crosswalks.

North Carolina has its fair share of all of these, plus plenty of pickup trucks. What sets Raleigh and its surrounding towns apart is the greenway network.

The Capital Area Greenway System consists of about 120 miles of multiuse trails for hikers, cyclists and wheelchair users across more than 3,700 acres of protected land. The network extends beyond Raleigh, too. They connect with neighboring greenway networks, allowing longer rides toward Cary, Durham and Morrisville.

Raleigh’s affectionately known as the City of Oaks, and this trail system truly allows residents easy access to nature. Some cities bring residents to the trailhead by bus. Raleigh put the trailhead in the city.

Here are three longer routes through Raleigh, plus two more regional trails worth exploring.

Camp & Country · Ride guide

Find your next Triangle bike ride

Five greenways and rail-trails, from a river-hugging epic to a ride along an old tobacco rail line. Select a numbered map marker or trail card to discover highlights and access alerts.

Choose your ride:Select a trail card or numbered map marker.
View trail alerts3 affected routes · Updated Nov. 18, 2026
Trail alerts as of Nov. 18, 2026Raleigh alerts ↗Cary greenways ↗
Schematic map of five Triangle bike trails. Not to scale; not for navigation.NRALEIGHDURHAMCARYAPEXKNIGHTDALEWAKE FORESTMORRISVILLEFalls LakeNeuse RiverLake JohnsonShelley LakeLake CrabtreeUmsteadGame LandsBond ParkAnderson Point ParkFalls Lake DamMilburnie DamLassiter MillBuffaloe RoadI-540American Tobacco Campusto Clayton ↘Centennial Campus
  • Closed section
  • Scheduled closure
  • Periodic stoppages
  • Connecting greenway
  • Water · parks

Ride 1 of 5 · Riverside epic

Neuse River Trail

27.5miles one way
WhereEast Raleigh, from Falls Lake Dam to the Wake–Johnston county line

Raleigh’s longest greenway follows the Neuse River from the foot of Falls Lake Dam all the way to the Johnston County line, trading river views for winding wetland boardwalks, historic sites and open farm fields. It’s part of the statewide Mountains-to-Sea Trail, and at its southern end it connects toward Clayton.

City of Raleigh: Neuse River Trail (opens in a new tab)

Closed · no detour

Buffaloe Road Athletic Park to River Bend Park (mile markers 10–11.5)

Read trail advisory

Closed for a sewer improvement project, along with the trail access points at both parks. The city lists the closure from March 9, 2026, through Dec. 31, 2027.

Live updates: Raleigh greenway alerts ↗

Periodic stoppages

Auburn Knightdale Road to Battle Bridge Road (mile markers 22–23.25)

Read trail advisory

Complete 540 construction brings periodic stops in trail traffic; during closures, a temporary detour trail runs alongside the existing trail. Listed through Sept. 30, 2028.

Live updates: Raleigh greenway alerts ↗

Status as of Nov. 18, 2026. Conditions can change quickly — check official updates before you ride.

Highlights

  • Milburnie Dam and long, open views of the Neuse River
  • Winding boardwalks through wetlands, interpretive signs and farm fields
  • Anderson Point Park, near mile 17 — the hub where the Crabtree Creek and Walnut Creek trails join
Plan your ride

The Buffaloe Road closure splits the trail with no detour, so plan an out-and-back on one side of it. North: start near Falls Lake Dam or at the Horseshoe Farm Nature Preserve lot (2900 Horseshoe Farm Rd.). South: start at Anderson Point Park (20 Anderson Point Dr.). Official mile markers count from Falls Lake Dam.

Ride 2 of 5 · Creekside city crossing

Crabtree Creek Trail

18miles one way
WhereNorth Raleigh, from William B. Umstead State Park to Anderson Point Park

Crabtree Creek Trail runs southeast from the edge of William B. Umstead State Park to the Neuse River Trail at Anderson Point Park, following its creek across north Raleigh. Along the way it links everyday Raleigh — Crabtree Valley Mall, North Hills — with parks and a string of connecting greenways.

City of Raleigh: Crabtree Creek Trail (opens in a new tab)

Closure begins Nov. 30, 2026

Allegheny Drive to just east of Lassiter Mill Road (mile markers 9.5–11)

Read trail advisory

The city has scheduled a full closure for trail improvements from Nov. 30, 2026, through Dec. 20, 2028. No detour will be available; the Allegheny Drive access point stays open during the project.

Live updates: Raleigh greenway alerts ↗

Status as of Nov. 18, 2026. Conditions can change quickly — check official updates before you ride.

Highlights

  • A western start at the edge of William B. Umstead State Park
  • The Mine Creek Trail connection, leading toward Shelley Lake
  • Historic Lassiter Mill, Kiwanis Park and North Hills Park (note the Lassiter Mill-area closure)
Plan your ride

From Nov. 30, the trail will be split near Lassiter Mill with no detour, so plan to ride one end at a time. West: the official lot at 4924 Ebenezer Church Rd. is near the Umstead end. East: start at Anderson Point Park (22 Anderson Point Dr.) and ride upstream.

Ride 3 of 5 · Lakes to the river

Walnut Creek Trail

15.6miles one way
WhereSouth Raleigh, from Lake Johnson Park to the Neuse River Trail

Walnut Creek Trail crosses southern Raleigh for more than 15 miles, linking Lake Johnson Park with the Neuse River Trail. The city pitches it as a ride through every kind of Raleigh — natural, urban and residential — and its eastern section is part of the East Coast Greenway.

City of Raleigh: Walnut Creek Trail (opens in a new tab)

No closures listed

Read trail advisory

The City of Raleigh’s greenway alerts page (updated Nov. 13, 2026) lists no closures on this trail.

Live updates: Raleigh greenway alerts ↗

Status as of Nov. 18, 2026. Conditions can change quickly — check official updates before you ride.

Highlights

  • Lake Johnson’s loop trail and waterfront at the western end
  • Walnut Creek Wetland Park and its trailhead
  • Connections to NC State’s Centennial Campus, Lake Raleigh and the Farmers Market via the Centennial Bikeway Connector
Plan your ride

Think of this as a stitched-together cross-town ride: in a few places it follows sidewalks and street crossings, so check the city’s segment maps before you go. Walnut Creek Wetland Park (950 Peterson St.) is a handy central starting point.

Ride 4 of 5 · Cary’s wetland link

White Oak Creek Greenway

7.38miles combined
WhereCary and Apex, from Bond Park to the American Tobacco Trail

Cary’s signature cross-town greenway starts at the Greenway Hub in Fred G. Bond Metro Park and heads west on 10-foot-wide asphalt, along creek edges, through neighborhoods and underpasses, and across wetland boardwalks before continuing through Apex to the American Tobacco Trail. It’s part of the East Coast Greenway.

Town of Cary: White Oak Creek Greenway (opens in a new tab)

Closed · reopening anticipated Jan. 2027

Green Level Church Road to I-540

Read trail advisory

Closed for repairs to two boardwalk bridges; construction began Nov. 13, 2026. There is no practical detour, and the Batchelor Branch Greenway connector from High House Road is also closed during construction. Cary anticipates reopening in January 2027, weather and construction conditions permitting.

Live updates: Town of Cary greenways ↗

Status as of Nov. 18, 2026. Conditions can change quickly — check official updates before you ride.

Highlights

  • The Greenway Hub at Bond Park, where the Black Creek Greenway links in
  • A mural-lined underpass painted with native flowers, between MacArthur Drive and Davis Drive
  • Wetlands and boardwalks on the western half (partly closed for repairs)
Plan your ride

Ride it in two pieces for now. East: Bond Park toward I-540, with restrooms at Bond Park, Ed Yerha Park and Davis Drive Park. West: from the White Oak Creek Trailhead at 8232 Green Level Church Rd. (22-space lot), the greenway stays open toward the American Tobacco Trail.

Ride 5 of 5 · Rail-trail to Durham

American Tobacco Trail

≈22miles one way
WhereSouthwestern Wake County, Chatham County and Durham

The American Tobacco Trail follows a former Norfolk Southern rail corridor that once carried tobacco toward Durham’s American Tobacco Company. Today it links southwestern Wake County, Chatham County and Durham, finishing near the American Tobacco Campus downtown. Wake County manages a 6.5-mile section; Cary and Durham manage the rest.

Wake County: American Tobacco Trail (opens in a new tab)

Holiday closures

Wake County section closed Thanksgiving Day (Nov. 26)

Read trail advisory

Wake County’s section also closes Christmas Eve, Christmas Day and New Year’s Day. The Wimberly Road parking area and the section previously closed for landslide repair have reopened, according to the county.

Live updates: Wake County ATT page ↗

Status as of Nov. 18, 2026. Conditions can change quickly — check official updates before you ride.

Highlights

  • An old railroad corridor with deep roots in Durham’s tobacco history
  • A tobacco barn built of hand-hewn logs along the Wake County section
  • Woods of the Jordan Lake Game Lands, then a finish near Durham’s American Tobacco Campus
Plan your ride

Wake County’s section opens at 8 a.m. and closes 30 minutes before sunset, with parking at New Hill-Olive Chapel Road, Wimberly Road and White Oak Church Road. Horseback riders share that section. Turning onto White Oak Creek Greenway? For now it’s open from the ATT only as far as the Green Level Church Road trailhead.

Showing American Tobacco Trail, about 22 miles one way.

About this map: Route lines are hand-drawn schematics based on official trail descriptions. They show general location and how the trails connect — they are not to scale, closure locations are approximate, and the map is not for navigation. Distances are approximate one-way figures from official trail pages.

Conditions change. Trail status is as of Nov. 18, 2026. Check before you ride: Raleigh greenway alerts · Cary greenways · Wake County: American Tobacco Trail

Neuse River Trail

The Neuse River Trail runs 27.5 miles one way along Raleigh’s eastern side, from Falls Lake Dam to the Wake-Johnston county line. Anderson Point Park lies along the route and is a great place to toss a flying disc or football around or stop for lunch.

It follows the Neuse River, offering beautiful views as it winds past open fields and farmland, away from the hustle and bustle of downtown Raleigh. At the county line, it connects with the Clayton River Walk on the Neuse, a 4-mile paved trail.

Treat yourself to an espresso with a detour to 9BAR Coffeehouse in Clayton’s Riverwood neighborhood.

Crabtree Creek Trail

The Crabtree Creek Trail runs 18 miles from the Neuse River Trail west toward William B. Umstead State Park.

For a winding, sometimes grueling change of scenery, the park has gravel multiuse trails open to mountain and gravel bikes. Check access before planning that connection: Bridge work currently blocks the route north into Umstead along Turkey Creek.

The greenway passes Crabtree Valley Mall. Take a turn onto the Mine Creek Trail for a detour toward Shelley Lake and the Sertoma Arts Center.

For a post-ride meal, consider tacos at Mala Pata on Crabtree Boulevard. Check its hours before planning your stop; it currently opens in the evening.

Walnut Creek Trail 

The Walnut Creek Trail runs across southern Raleigh for more than 15 miles, from Lake Johnson to the Neuse River Trail.

Pack a lunch and spend some time at Lake Johnson Park. Bring a fishing pole for some catch-and-release from the boardwalk or fishing pier, and follow state fishing regulations.

White Oak Creek Greenway

All right, we’ve officially left Raleigh. Cary’s White Oak Creek Greenway links Bond Park with the American Tobacco Trail. It’s a great connector: At Bond Park, you can follow Black Creek Greenway toward Lake Crabtree County Park and Umstead State Park.

Check Cary’s greenway alerts before planning a through-ride. A section between Green Level Church Road and Interstate 540 is currently closed for boardwalk assessments, with no practical detour.

American Tobacco Trail

The American Tobacco Trail is the mother of all these routes. It runs about 22.6 miles one way and is relatively flat. You’ll get a range of experiences as it winds through wooded stretches in Wake and Chatham counties and into Durham.

Ride north to finish near Durham Bulls Athletic Park and the American Tobacco Campus, where options include Mellow Mushroom pizza, East of Texas barbecue and Fullsteam Brewery. You’re already on the edge of downtown, with plenty more to explore nearby.

Before you ride

Check Raleigh’s greenway alerts before choosing your route. A section of the Neuse River Trail between Buffaloe Road Athletic Park and River Bend Park is currently closed without a detour, so don’t count on riding its full length. Work near Lassiter Mill is also scheduled to close part of Crabtree Creek Trail beginning in late November 2026.

Start with a manageable out-and-back ride, wear a helmet and slow down around other trail users. Follow posted speed limits and announce yourself before passing.

Your home base for the great outdoors. Sign up for the Camp & Country newsletter

Keep the adventure going. Follow Camp & Country on Instagram, Facebook, X and Bluesky for outdoor inspiration, trip ideas and more.

Filed under: Explore · Know Before You Go · Outdoor Travel · Parks & Public Lands · Southeast
Scroll to Top